Contact Us

Phone
(02) 9607 2864

Email
enquiry@nastasiassociates.com.au

Address
Unit 5, 1 - 3 Whyalla Place,
Prestons, NSW 2170

Online Enquiry

* Required fields

Modular & Transportable Buildings

Nastasi & Associates engineer modular buildings for some of the most demanding construction sites and sporting teams. We have expertise in modular buildings from design and manufacture of modules, to transportation and all the way to structural sign off.

 

Our capabilities in modular building design include: 

- Fast turnaround times. Engineering modular buildings needs to be timely as most projects have tight completion times of just weeks instead of months and years. Most projects we work on are completed within 15 -20 weeks.

- Structural solutions also include fire engineering design, required for multi storey modular building construction.

- Designing for larger spans between supports with tight head heights.

- Engineering designs incorporating concrete floors with higher kPa or dynamic load requirements such as gymnasium floors. A great example of this is the new Parramatta Eels Community Rugby League Facility, Stage 1. See inside this new facility 

- Gantry beams integrated into the modular design of the buildings or engineered externally for hired modular building structures.

- Design of lifting and tie down locations without taking away from the unique, neat look of sporting complexes, especially for multi level buildings.

Western Sydney Wanderers - Blacktown

Sydney Roosters NRL Club - Sydney

Crane moving transportable building into position

Installing transportable modules in complex

Built off site inside a factory 

Floor chassis and framing

Modular building built off site

Electrical cabling done off site

Support structure for concrete floors

Laying substrate flooring

Modular & transportable construction

Internal plasterboard and finishing

Engineer Footing Inspection

Installation Modular Building Complex

Site Works for Modular Building

New Tigers NRL Club Facility